• Bocci-Home-Page-Rotator-Image-3-of-5
  • plant
  • Windmills-in-the-Storm
  • offshore1

OIS / Pemex, Gulf of Mexico

Offshore-Rig

ISO 9001, Turbine Control OIS / Pemex

Bocci was contracted as the owner’s representative for detailed inspection of an enclosure structure being manufactured for a process critical turbine control room and containment on an offshore platform in the Gulf of Mexico. The owner required ISO 9000 compliance, weekly construction inspections and schedule management for this critical path unit under a rigid delivery schedule. The services included inspection and reporting on all purchasing activities, production and fabrication inspections, mechanical, structural, electrical, HVAC, and instrumentation and controls engineering documentation, quality control, budget control and specification compliance. Weekly coordination with the owner included status reports on all activities. The completed construction met all design, specification, compliance and schedule requirements before being shipped off shore for installation in the Gulf of Mexico by OIS.

ISOBulletoperationsBullet Inspection & Field Services

For more information:
Inspection & Testing, Oil & Gas Production, Quality & ISO Services

Contact us for more information.